Got so much done today....

First, bought the new toilet, an American Standard, it was $150, I had a coupon so it kept the cost down.

Then waited out some of the rain, had a snack, then took a trailer full of garbage to the dumpster.

THen since it was raining, time to work on the floor joists for the bedroom. they are in place, but before I do the final install on the joist hangers I need to get subflooring down to adjust them to make them even with the edges.  Then take the subfloor back out, and insulate...


Woo Hoo! getting stuff done, even in the poring rain.

Comments

Popular posts from this blog

Trip to Bangs...Pop 1500er so....

More art art art.....